Clear Commodity Network Clear Commodity Network
  • Home
  • Metals
  • Energy
  • Agriculture
  • Podcasts
  • Playlists
  • Prices
Clear Commodity Network Clear Commodity Network Clear Commodity Network Clear Commodity Network
  • Home
  • Metals
  • Energy
  • Agriculture
  • Podcasts
  • Playlists
  • Prices
Cover for Vista Gold – 10.6 Million Ounces Of Aussie Gold And Key Takeaways From The New Optimized Feasibility Study At The Mt Todd Project

Vista Gold – 10.6 Million Ounces Of Aussie Gold And Key Takeaways From The New Optimized Feasibility Study At The Mt Todd Project

August 24, 2025
  • Company
KEReport
By KEReport
KEReport

Fred Earnest, President and CEO of Vista Gold Corp. (NYSE American and TSX: VGZ), joins us for comprehensive update on the revised Resource Estimate, and the new optimized Feasibility Study announced July 29th at their Mt Todd Gold Project.  Mt Todd is a ready-to-build development-stage gold deposit located in the Tier-1 mining jurisdiction of Northern Territory, Australia.

Fred reviews the 10.6 million ounces of gold resources in all categories, and the infrastructure and jurisdiction advantages to the working in this area of Australia. We then shifted over to lower capex and key efficiencies outline in the updated 2025 Feasibility Study (“2025 FS”). This new 2025 FS provides a favorable development alternative to Vista’s previous feasibility study completed in 2024 at 50,000 tpd, as it now envisions a 15,000 tonnes per day (“tpd”) mining scenario.  This smaller initial project has a much lower capex, and prioritizes higher grade ore being sent to the processing plant, significantly reducing development capital required and operational risks.

 FEASIBILITY STUDY HIGHLIGHTS 

  • Average annual gold production of 153,000 ounces during years 1-15 and 146,000 over the 30-year life of mine
  • Average ore grade of 1.04 grams gold per tonne (“g Au/t”) over the first 15 years of operations and 0.97 g Au/t over the life of mine
  • Life of mine average gold recovery of 88.5% from 3-stage crush, single-stage sort, 2-stage grind, and carbon-in-leach (“CIL”) recovery circuit
  • Contract mining and third-party power generation reduce capital costs and operational risks
  • Future expansion opportunities not evaluated in the Study, but considered in designs and layouts

ROBUST PROJECT ECONOMICS

  • After-tax NPV5% of $1.1 billion, IRR of 27.8% and 2.7 year payback at a $2,500 per ounce gold price
  • After-tax NPV5% of $2.2 billion, IRR of 44.7% and 1.7 year payback at spot gold price ($3,300 per ounce)
  • After-tax free cash flow at a $2,500 gold price of $1.6 billion for first 15 years of commercial operations
  • Initial capital requirements of $425 million, a 59% reduction from the 2024 FS
  • Capital Efficiency: $93 per ounce (initial capital : total ounces of gold produced)
  • All-in Sustaining Cost of $1,449 per oz years 1-15 and $1,499 per oz years 1-30

 

If you have questions for Fred regarding Vista Gold, then please email those into us at Fleck@kereport.com or Shad@kereport.com. 

 

Click here to follow the latest news from Vista Gold Corp

KEReport
KEReport
The KE Report provides exclusive interviews with private money managers and sub $10 billion market cap companies. Interviews are published daily to help investors navigate the markets.
View all podcast by KEReport

Subscribe for Clear Insights

Freshly dropped news & interviews delivered to your inbox daily.
Please review our Disclaimer and Privacy Policy.

More Clear Commentary:

Cover for Fuerte Metals - Transformative Acquisition of the Coffee Gold Project from Newmont

Fuerte Metals - Transformative Acquisition of the Coffee Gold Project from Newmont

Cover for Emerita Resources – Permits Granted To Explore 2 Regional Targets At The IBW Project - San Antonio And Terranova, Plus An Acquisition Of The Nueva Celti Project

Emerita Resources – Permits Granted To Explore 2 Regional Targets At The IBW Project - San Antonio And Terranova, Plus An Acquisition Of The Nueva Celti Project

Cover for Val-d’Or Mining - Prospect Generator Building a Royalty Portfolio in Quebec & Ontario

Val-d’Or Mining - Prospect Generator Building a Royalty Portfolio in Quebec & Ontario

Cover for Mako Mining – Acquisition Of The Permitted Mt. Hamilton Gold-Silver Project in Nevada Along with a Well-Defined Tungsten-Copper-Molybdenum Target, Without Any Equity Dilution

Mako Mining – Acquisition Of The Permitted Mt. Hamilton Gold-Silver Project in Nevada Along with a Well-Defined Tungsten-Copper-Molybdenum Target, Without Any Equity Dilution

Cover for Gold Hart Copper Returns to Tolita

Gold Hart Copper Returns to Tolita

Cover for AbraSilver Resource – Next Batch Of Silver And Gold Drill Assays Returned From The Oculto East And JAC Zones Expanding Mineralization At The Diablillos Project

AbraSilver Resource – Next Batch Of Silver And Gold Drill Assays Returned From The Oculto East And JAC Zones Expanding Mineralization At The Diablillos Project

  • Tweet
  • Share
  • Share
  • Share
  • Share
  • Share
  • Tweet
  • Share
  • Share
  • Share
  • Share
  • Share