
Vista Gold Highlihgts a Refined Feasibility Study for Mt Todd
Fred Earnest of Vista Gold joins the podcast to walk through the newly refined feasibility study for the Mt Todd Gold Project in Australia. The report shows a smaller scale operation as previously reported, operating at a 15,000 tonnes per day operation. Using $2,500 per ounce gold price, project economics with the report show an After-Tax NPV (5%) of US$1.1 Billion with an After-Tax IRR of 27.8%